Our latest development for Portland Zementwerke Gebr. Seibel GmbH & Co KG in the field of de-dusting and filtering engineering concerns a de-dusting solution for clinker coolers. The unit is designed to cope with an air volume amounting to 280,000m³/hour. It consists of a tube filter unit of Type SK60/4-XXIV with paired tubes each with 12 chambers. This has been a real challenge for the assembly team as the unit is over 20 metres in height.
The unit is designed to cope with an air volume amounting to 280,000m³/hour. It consists of a tube filter unit of Type SK60/4-XXIV with paired tubes each with 12 chambers. This has been a real challenge for the assembly team as the unit is over 20 metres in height.
The technical specifications in detail
- It consists of a filter unit with paired tubes each with 12 chambers
- In each chamber there are 60 filter tubes each are 4.5 metres in length
- The total number of filter tubes amounts to 1,440
- The air volume amounts to 280,000m³/ hour
- The filter tubes have a total area of 2,800m²
- The residue dust amounts to less than 10mg
- The project comprises the actual de-dusting unit including the pipework and the assembly of the unit